Air conditioning installation: what to expect, step by step

What happens when home air conditioning is installed, from the survey to switching on, how long it takes, how much mess there is, and the certificates you should get.

Engineer fitting a wall-mounted air conditioner in a living room, alongside an outdoor unit and installation checklist, with Solair branding.

Fitting air conditioning in one room usually takes a single day. The engineers mount a slim unit on the inside wall, drill one hole through to the outside, fit the outdoor unit on the ground or on wall brackets, connect the two with insulated pipes and a cable, then test the system and show you how to use it. A multi-room system usually takes two or three days.

Most people are surprised by how little disruption there is. Here is what happens at each stage, and what to check your installer gives you at the end.

Step 1: the survey

A good installation starts with a visit to your home before any price is agreed. On a survey the installer should:

  • Measure each room and look at the windows, the direction it faces and the insulation, to work out the right unit size. Our guide to sizing air conditioning explains how this works.
  • Agree where the indoor unit goes. It is usually high on a wall, where it can blow air across the room without blowing straight onto a bed or sofa.
  • Agree where the outdoor unit goes. This needs space for air to flow, a solid base or wall, and a sensible position for noise. Neighbouring windows matter here.
  • Plan the pipe route between the two, including whether it can run straight through the wall behind the indoor unit or needs to travel along a wall or through a loft.
  • Check your electrics, including your consumer unit, to see how the system will be powered safely.
  • Check planning. Most houses in England can fit a reversible system under permitted development, but there are rules on size, siting and noise. Our planning guide covers them.

You should then get a written quote that names the exact units, the sizes and what is included.

Step 2: preparing for installation day

There is not much you need to do. It helps to:

  • Clear the wall where the indoor unit will go, and move furniture back from it.
  • Clear a path to the outdoor unit position, including any side gate.
  • Make sure there is parking nearby for the van.
  • Let neighbours know if the outdoor unit is going near a shared boundary. It is a courtesy, not a requirement.

Step 3: what happens on the day

Every installation is a little different, but most single-room jobs follow the same order.

Protecting your home. The engineers lay dust sheets in the room and along the route they will walk.

Fitting the indoor unit’s bracket. A metal mounting plate is fixed to the wall and checked with a level. The unit needs a slight fall towards the drain side so water runs away properly.

Drilling the wall. A single hole, typically around 65mm across, is drilled through the wall with a core drill. This is the noisiest and dustiest part of the day, and it usually takes less than half an hour. The engineers use dust extraction and the hole is sleeved and sealed afterwards.

Fitting the outdoor unit. The outdoor unit goes on a ground stand, a concrete pad or wall brackets with anti-vibration mounts. It must have space around it for air to flow.

Running the pipes. Two insulated copper refrigerant pipes, a condensate drain pipe and a cable run between the units. Where they run along an outside or inside wall, they are covered with neat plastic trunking, which can usually be painted. The condensate pipe carries water from the indoor unit to a drain or a soakaway outside.

Electrical connection. The system is wired in. Depending on its size and your consumer unit, this may be a new dedicated circuit. A new circuit is notifiable work under the building regulations in England, so it must be done by an electrician registered with a competent person scheme, or signed off by your local building control.

Testing. This is the step that separates a proper installation from a poor one. The engineer pressure-tests the pipework with dry nitrogen to prove there are no leaks, then pulls a deep vacuum on it to remove air and moisture. Only then is the refrigerant released into the system.

Commissioning and handover. The system is switched on and checked in cooling and heating modes. The engineer then shows you how to use the remote or app, how to clean the filters and what the different modes do.

How long does it take?

JobTypical time on site
One room, short pipe runOne day
One room, long pipe run or awkward accessOne to two days
Two to three rooms on a multi-splitTwo to three days
Four or more roomsThree days or more

Things that add time include long pipe runs across a house, routing pipes through a loft or between floors, very thick or stone walls, and outdoor units that need to go high up on a wall.

How much mess is there?

Less than most building work. The main dust comes from drilling the wall hole, and a good team will control it with extraction and clean up before they leave. You may need to fill and touch up a small amount of paint around the trunking or the unit. There is no need to move out or empty the room.

Who is allowed to install air conditioning?

Air conditioning contains fluorinated gases (F gas), so the law is strict about who can work on it. In Great Britain:

  • Each engineer who installs or services a system must hold their own F gas qualification. A Category 1 certificate covers all work, and a Category 2 certificate covers systems with less than 3kg of F gas, which includes most home systems.
  • The company that installs the system must hold an F gas company certificate from an approved certification body, such as Refcom, F-Gas Register (Quidos) or Bureau Veritas. Company certificates are renewed every three years.

Anyone can buy a unit online, but they cannot legally connect the refrigerant pipework and charge the system without these qualifications. Some kits are sold as DIY “pre-charged” systems, but they still need correct installation to be safe, efficient and covered by the manufacturer’s warranty.

Paperwork you should get at the end

Before the engineers leave, or shortly after, you should receive:

  • An electrical installation certificate or minor works certificate for the electrical connection, and a building regulations compliance certificate if a new circuit was added.
  • Commissioning details, showing the system was pressure-tested, vacuumed and charged correctly.
  • Warranty registration with the manufacturer. Many manufacturers give longer warranties when the system is fitted and registered by an approved installer.
  • The noise calculation for permitted development, if your installation relies on it.
  • A clear invoice showing the VAT charged. Our cost guide explains what affects the price.

Looking after your system afterwards

Air conditioning needs very little day-to-day care. Clean or rinse the indoor unit’s filters every few weeks when you are using it heavily, and keep leaves and plants clear of the outdoor unit.

Most manufacturers recommend an annual service by an F gas engineer, and many make it a condition of the extended warranty. A service usually includes cleaning the coils and filters, checking the drain, checking for leaks and confirming the system is performing as it should.

Questions to ask any installer

  • Are your engineers and your company F gas certified, and can I see the certificates?
  • Will you survey my home before giving a fixed price?
  • Which brand and model are you fitting, and what size?
  • How will the system be powered, and will I get an electrical certificate?
  • Will you carry out a nitrogen pressure test and a vacuum before charging?
  • Have you checked the permitted development and noise rules for my home?
  • What warranty do I get, and what servicing does it need?

Frequently asked questions

Do I need to be home during installation?

Someone needs to be there at the start to agree the final positions, and at the end for the handover. You do not need to stay in the room while the work is done.

Can air conditioning be fitted to an internal wall?

Yes. The indoor unit can go on an internal wall, with the pipes running through a loft, ceiling void or along a wall to the outside. It usually means a longer pipe run and more trunking, so it may take longer and cost a little more.

How far can the outdoor unit be from the indoor unit?

It depends on the model. Many home systems allow pipe runs of 15 to 20 metres or more, though shorter runs are more efficient and cheaper to fit. Your installer will check the limits for the unit they are fitting.

Will installing air conditioning damage my walls?

There is one hole per indoor unit, sealed after fitting, plus screw fixings for the bracket and trunking. If the unit is ever removed, the hole can be filled and made good.

Can I install air conditioning myself?

You can fit brackets and plan positions, but connecting and charging the refrigerant system must be done by an F gas certified engineer working for a certified company. The electrical connection also has to meet the building regulations.

Ready to talk about your home? Read more about air conditioning with Solair, try our instant estimate, or request a free survey and we will send you a fixed, written price. We cover homes across Surrey, Sussex, Hampshire and London.

Guides

Get your fixed price

Ready to cut your bills and stay comfortable?

Send us a few details and we will come back with a fixed, written price. No obligation and no pushy follow-up.

  • We reply within one working day
  • Free survey before any price is final
  • Your details are never sold or passed to salespeople
  • Prefer to talk? 020 8064 2545
Call Get my price